Project Overview

Architectural restoration and finish repair following a wireless infrastructure upgrade at the Walter E. Washington Convention Center.

Challenge

Following a wireless access point upgrade, several wall and ceiling areas required restoration where previous WAP mounting locations and temporary access openings remained.

The work needed to restore these areas while maintaining a professional finished appearance and coordinating around an active convention facility with ongoing events and restricted work areas.

Bailey Systems Solution

Bailey Systems provided a dedicated restoration crew to repair areas affected by the previous wireless installation. Work included removing abandoned mounting hardware, patching wall and ceiling penetrations, restoring temporary drywall access openings, and priming and painting repaired surfaces to closely match surrounding finishes.

Bailey also coordinated work areas, lift operations, materials, and scheduling around facility operations to minimize disruption.

Project Scope

Wall & Ceiling Restoration

  • Removed abandoned anchors, screws, and mounting hardware
  • Patched penetrations from former WAP locations
  • Finished, sanded, primed, and painted repaired areas

Drywall Restoration

  • Removed temporary 12" × 12" access hatches
  • Installed backing and gypsum board where required
  • Taped, mudded, sanded, and primed openings
  • Matched repaired areas to surrounding finishes

Site Coordination & Safety

  • Protected surrounding finishes and active work areas
  • Utilized appropriate fall protection and lift safety practices
  • Coordinated equipment and materials around facility operations
  • Accommodated after-hours work when necessary

Technologies Used

Drywall Restoration, Finish Repair, Custom Paint Matching, Facility Coordination

Results

  • Restored wall and ceiling areas affected by the wireless infrastructure upgrade
  • Repaired former WAP mounting locations and temporary access openings
  • Matched repaired surfaces to surrounding finishes
  • Coordinated work around the active convention facility to minimize disruption
  • Maintained clean and protected work areas throughout the project
  • Supported the completed technology upgrade with professional finish restoration

Stay Updated with the Latest from Us

Subscribe to our newsletter for exclusive updates, tech tips, and special offers. Stay ahead with Bailey Systems
You have been successfully Subscribed! Ops! Something went wrong, please try again.

© 2025 by Bailey Systems, LLC. All rights reserved.